|
The way forward
|
|
|
![]() Full Draught ProofingBoth sashes are lifted out of the frame. Where it impedes movement excessive paint build up is removed. small groves are cut into the timber using a high precision grooving machine, carrier, pile & seal are inlaid to the groove. Existing parting bead is removed and replaced with a new timber parting bead. The sashes are then accurately weighed and, if required, additional counterbalance weights are added. new pulley wheels are installed where necessary. The sashes are realigned where practical and then carefully reassembled within the box frame with new sash cords. New staff bead with brush pile is then installed. New timber will be primed ready for decoration, or if requested will be decorated by our installer.
Side, top openers and doors A similar system is used where the casements or doors are removed from the frame and aligned, grooves are then cut and inlayed with carrier, pile and seal, the casement or door is then hung and adjusted as needed.
![]()
|
|
Last modified: 01/12/07 |