4wood Joinery

                                                                                             The way forward

Draught Proofing

                            

 

Up
Recent Projects
Products

Full Draught Proofing

Both sashes are lifted out of the frame. Where it impedes

movement excessive paint build up is removed. small groves are

cut into the timber using a high precision grooving machine,

carrier, pile & seal are inlaid to the groove. Existing parting bead

is removed and replaced with a new timber parting bead. The

sashes are then accurately weighed and, if required, additional

counterbalance weights are added. new pulley wheels are installed

where necessary. The sashes are realigned where practical and

then carefully reassembled within the box frame with new sash

cords. New staff bead with brush pile is then installed. New timber

will be primed ready for decoration, or if requested will be

decorated by our installer.

 

 

 

Side, top openers and doors

A similar system is used where the casements or doors are

removed from the frame and aligned, grooves are  then cut  and

inlayed with carrier, pile and seal, the casement or door is then

hung and adjusted as needed.

 

 

 

 

 

 

 

 

 

 

 


 

 

Home ] Up ]

Last modified: 01/12/07